What causes uneven load sharing between parallel LPG generator sets?

Uneven load sharing between parallel LPG generators usually comes from mismatched governor settings, incorrect load-sharing signals, restricted LPG delivery, or inconsistent excitation control. When one unit carries more load after another joins the bus, first determine whether the imbalance is in active power (kW), reactive power (kVAr), or both. These require different corrective actions: governors primarily control kW sharing, while automatic voltage regulators (AVRs) and excitation controls primarily govern kVAr sharing.

A parallel LPG generator set installation may maintain normal bus voltage and frequency while one machine approaches its engine or alternator limit. Equal current readings alone do not prove correct sharing, and unequal currents do not automatically indicate a fault. Unresolved imbalance can cause overheating, reverse-power trips, overload trips, or unstable operation during load changes.

Establish whether the sharing is actually incorrect

Compare each generator’s load against its own rating and configured operating target. Equal-rated machines normally share approximately equal kW when configured for balanced operation. Different-sized machines generally share proportionally to their available capacity, unless the control system deliberately assigns different loads. A derated engine should not be forced to match a healthier unit’s output.

Record kW, kVAr, kVA, power factor, phase currents, bus frequency, and controller operating mode at the same time. Include load setpoints and any active power limits. Compare readings under a steady load before investigating transient behavior.

Observed patternPrimary investigation
Unequal kW with reasonably balanced kVArGovernor configuration, load-sharing signals, fuel delivery, or engine capability
Similar kW but unequal kVAr or opposing reactive-power signsAVR settings, reactive-sharing circuits, sensing, or excitation mode
Both kW and kVAr readings appear inconsistentMetering, CT/PT configuration, controller modes, and separate active/reactive faults
Sharing deteriorates mainly after a load increaseFuel-system capacity, actuator limits, ramp settings, or control-loop response

Confirm whether the plant is islanded or connected to a utility. Islanded systems must regulate their own frequency and voltage; grid-parallel systems commonly use active-power and power-factor or reactive-power targets. A configuration suitable for one arrangement may be inappropriate for the other.

Governor settings and load-sharing commands

Once generators are synchronized, their speeds are constrained by the common bus frequency. A governor adjustment therefore changes engine torque and kW contribution rather than allowing one unit to run continuously faster than another.

Mismatched speed references or droop slopes can produce a steady kW offset. In droop-based sharing, verify the specified droop characteristics and reference settings for every unit. With coordinated isochronous load sharing, check that all participating controllers are in the intended mode and exchanging valid load information. Independent isochronous governors operating without a compatible sharing arrangement can compete and hunt.

Inspect the complete command path before changing tuning parameters:

  • Confirm controller-rated power values, load targets, participation status, and any unequal dispatch settings.
  • Check load-sharing communication health, node addresses, termination, and shielding against the equipment documentation.
  • For analog sharing systems, verify signal polarity, scaling, continuity, and grounding requirements.
  • Review actuator feedback, throttle travel, ramp rates, deadbands, and minimum or maximum output limits.

A unit receiving a higher kW command but showing little output increase may have reached a fuel, actuator, or engine limit. A unit producing excessive kW despite a low command points more strongly toward command interpretation, actuator behavior, or governor configuration. Adjusting droop without making this distinction can hide the original fault.

LPG delivery can limit one engine before the other

Fuel starvation often becomes visible only when the plant load rises. A regulator may hold acceptable pressure at idle yet fail to maintain the required inlet pressure at high demand. Restricted filters, undersized branches, inadequate vaporizer capacity, or insufficient tank vaporization can leave one engine unable to follow its load command.

Measure pressure at the manufacturer’s specified test points under load, not only at the common supply header. Compare the branches feeding each engine and look for a pressure drop that coincides with falling kW or increasing throttle demand. Use the specified pressure range for the installed fuel train; there is no universal LPG pressure setting suitable for every engine.

Regulator cooling or frosting can accompany vaporization problems, but appearance alone is not a diagnosis. Check vaporizer heat supply where fitted, tank conditions, gas temperature, filter condition, and piping capacity. LPG composition and ambient temperature also affect vapor availability.

Stable inlet pressure does not rule out an engine-side problem. Inspect mixer or fuel-valve operation, air filters, ignition components, misfire indications, and relevant engine alarms. Compression or combustion faults may reduce available torque while frequency remains normal because the other generator carries the deficit.

Fuel-system inspections require approved procedures. Do not loosen pressurized connections to test flow, apply improvised heat to LPG equipment, or bypass fuel safety devices. Suspected leakage requires isolation and the site’s gas-safety response before load-sharing work continues.

Reactive imbalance belongs to the excitation system

When kW sharing is satisfactory but one alternator carries excessive current or kVAr, investigate excitation rather than adjusting the governor. Different AVR voltage references can create circulating reactive current between machines, even when the external load requires little reactive power.

Check reactive droop settings, voltage-sensing connections, CT ratios, CT polarity, and the intended phase relationship. Cross-current compensation or digital reactive-sharing arrangements must be wired and configured consistently. Incorrect compensation polarity can reinforce an imbalance instead of reducing it.

Confirm that each controller uses the intended voltage, power-factor, or kVAr mode. Conflicting targets can make one generator supply reactive power while another absorbs it. On a common bus, terminal voltages may look nearly identical despite a substantial reactive imbalance.

Respect alternator capability limits during adjustment. Acceptable kW does not guarantee acceptable stator current or excitation loading. Opposing kVAr readings should prompt investigation, especially if they persist at low plant load.

Verify measurement before changing calibration

A reversed CT, wrong phase assignment, incorrect ratio, or mismatched voltage reference can make a healthy generator appear incorrectly loaded. Where those measurements feed the sharing controller, the same error can also create a real imbalance by causing incorrect control commands.

Compare controller readings with a suitable calibrated power analyzer using approved connection procedures. Verify phase sequence and the association between each current channel and its voltage channel. Do not open an energized CT secondary; use the designated test facilities and qualified personnel.

Nameplate values must come from the actual installed equipment. For example, the listed AMC30GFJ-PZ within 30-90kW biogas generator sets is rated at 30 kW (37.5 kVA), 400 V, and 50 Hz. Those figures illustrate the separate ratings that need checking, but this biogas product listing does not establish LPG suitability or parallel-operation compatibility. Neither should be assumed when selecting replacement equipment.

Restore balance without masking the fault

  1. Capture the original condition. Save settings, alarms, operating modes, and simultaneous load readings before making changes.
  2. Verify sensing and configuration. Correct metering errors, rating entries, participation settings, and communication faults first.
  3. Confirm engine capability. Establish adequate LPG delivery and healthy combustion before demanding additional kW.
  4. Adjust the relevant control only. Address governor settings for active-power imbalance and excitation settings for reactive-power imbalance, following the approved commissioning procedure.
  5. Retest across operating conditions. Check steady loads, controlled load steps, generator joining and leaving, and operation near the permitted limits.

Make one documented change at a time and retain reverse-power, overcurrent, and excitation protections. Acceptance should follow the equipment supplier’s sharing tolerances rather than an invented universal percentage. If balance is achieved only by pushing an actuator or excitation command against its limit, the underlying restriction remains; that condition should not be accepted as a completed repair.