A 40kW box-type LPG generator set can start HVAC compressors during an outage, but its suitability depends on more than the system’s running load.
Compressor starting current, motor-starting method, voltage dip tolerance, and other connected loads all affect whether the generator can deliver reliable performance.
This article examines the key electrical and operational factors technical evaluators should assess when sizing an LPG generator for HVAC backup, helping them identify potential starting issues before installation.
A 40 kW generator can be suitable when its rated output covers the running load and its transient capability supports the largest compressor start.
The answer is conditional: two HVAC systems with identical running power can impose very different starting demands, depending on compressor design and starting controls.
Check the generator’s standby rating, voltage, frequency, phase configuration, and site conditions first. A nominal 40 kW label alone does not establish compatibility.
Then ask the generator supplier to assess the complete starting sequence against the alternator’s motor-starting capability and the engine’s transient response.
For a direct-on-line motor, starting current can be several times its running current. Use the manufacturer’s locked-rotor amperage, or LRA, rather than an assumed multiplier.
For a three-phase motor, approximate starting apparent power as: starting kVA = √3 × rated line voltage × starting current in amperes ÷ 1,000.
For example, a 400 V compressor with an LRA of 100 A presents approximately 69 kVA at rated voltage during a direct-on-line start.
A 40 kW generator rated at 0.8 power factor has 50 kVA of rated apparent output. This comparison flags a possible starting challenge.
It does not prove failure: starting current changes as voltage dips, and the alternator may support a temporary current above its continuous rating.
Equally, it does not prove success. The engine, alternator, controls, and compressor must recover together within voltage and frequency limits specified by their manufacturers.
Starting current causes a temporary voltage dip. Excessive or prolonged dips can release contactors, reset controls, interrupt sensitive loads, or prevent the compressor from accelerating.
Ask the HVAC manufacturer for minimum starting voltage, allowable dip duration, and any restart restrictions. Compare those limits with the generator manufacturer’s transient performance data.
Frequency can also fall when the engine receives a sudden load. Confirm that the governor and engine can recover without triggering HVAC protection devices.
Wiring impedance adds voltage drop between the generator and compressor. Include cable length, conductor size, connections, and transformer impedance in the starting assessment.
A properly selected soft starter can reduce inrush by ramping motor voltage. Its settings must still provide enough starting torque for the compressor’s load.
A variable frequency drive, or VFD, can control acceleration and often reduce starting current. Confirm generator compatibility, input current, harmonics, and any recommended filtering.
Neither device guarantees success. Compressor restrictions, bypass arrangements, drive charging current, and the generator’s response to nonlinear loads should be checked with both suppliers.
Where practical, start compressors one at a time and delay nonessential loads. Sequence fans, pumps, and controls according to the HVAC manufacturer’s operating requirements.
List all equipment that may run during an outage, including air handlers, pumps, lighting, controls, and essential building loads, with their running and starting demands.
For each starting step, add the loads already running to the next motor’s starting demand. Also check continuous kW, kVA, and phase-current limits.
Identify the worst credible sequence, including automatic restarts after a brief interruption. Simultaneous compressor starts can exceed capacity even when normal running demand appears modest.
Load shedding and transfer-switch controls can prevent unwanted overlap. Verify their settings and failure behavior during commissioning, especially where HVAC operation depends on auxiliary pumps.
The fuel system must deliver sufficient vapor at the required pressure during starting, load changes, and sustained operation under the site’s lowest expected temperature.
Tank vaporization capacity, liquid level, regulators, pipe sizing, and simultaneous fuel users all matter. A qualified LPG supplier should verify the complete installation.
Confirm expected runtime using generator fuel-consumption data at the anticipated load and the usable fuel available. Avoid sizing storage from tank volume alone.
Also account for altitude, ambient temperature, ventilation, and enclosure airflow. Manufacturer derating may reduce the available output of a 40kW box-type LPG generator set.
Collect compressor nameplate data, LRA or drive input specifications, starting method, voltage tolerance, and the full outage load schedule before requesting a sizing review.
Ask the generator supplier for a documented motor-starting calculation or simulation showing predicted voltage dip, frequency response, recovery time, and the assumed starting sequence.
Review assumptions against the actual installation, including operating temperature, altitude, cable impedance, fuel pressure, and any generator derating or load-management settings.
Finally, commission the system under representative outage conditions. Observe compressor acceleration, voltage and frequency recovery, fuel pressure, and the behavior of other connected equipment.
AMICO also offers the 1200kW Silent type Containerized Gas Generator Set, model AMC1200NS, rated at 1,200 kW and 50 Hz.
Its electronic speed control and automatic operating functions address a different power scale. It should not be treated as evidence of 40 kW starting performance.
A 40 kW LPG generator is a viable HVAC backup candidate only after both running capacity and compressor starting performance are verified for the installation.
Use equipment data, a supplier-supported transient assessment, a suitable fuel supply, and a witnessed commissioning test to turn that preliminary judgment into a reliable decision.